DragonFly kernel List (threaded) for 2012-01
[
Date Prev][
Date Next]
[
Thread Prev][
Thread Next]
[
Date Index][
Thread Index]
Re: 3.0 release planning
On Sat, Jan 21, 2012 at 09:44:32AM +0100, John Marino wrote:
> On 1/21/2012 2:43 AM, Justin Sherrill wrote:
> >On Fri, Jan 20, 2012 at 2:35 PM, John Marino<dragonflybsd@marino.st> wrote:
> >
> >My goal was to tag so that anyone who wanted to put stuff in could,
> >without risk of destabilizing the release, and then bug fixes could be
> >applied back to that tag. That way we have something to work on while
> >the packages build.
>
> Applying back to the releas branch is kind of a pain, and at least
> two of us have made "git" mistakes doing it. Our goal (and I think
> it's Matt goal too) is that the actual release is pretty similar to
> what's tagged.
I second that. It's not like we're in a rush, we can afford a small period
of tests + bugfixes (let's say one week) before tagging.
--
Francois Tigeot
[
Date Prev][
Date Next]
[
Thread Prev][
Thread Next]
[
Date Index][
Thread Index]